Objective & Goals
  • To support the cottage industry in achieving standards of excellence in manufacturing process.
  • To disseminate the state of the art technology in the industrial sector by imparting training & skill development.
  • Capacity building of skilled work force involved in manufacturing process to prepare them to face challenges of industrialization globalization.
  • To enhance the employment generation.
Auto Parts Center Lahore
  • A state of the art, high tech Auto Parts Center has been established in Kot Lakhpat Industrial Estate in the year 2005 – 2007.
  • Estimated cost of Rs: 99.855 M, funded by Govt. of Pb (excluding land & building)
  • Objectives

    A support center for the development of auto parts, designing of tools and dies, provision of testing facilities to help small auto parts vendors to meet the challenges of WTO regime.

    Facilities Available

    •Reverse Engineering
    •Computer Aided Designing (CAD)
    •Computer Aided Machine (CAM)
    •Computer Aided Engineering (CAE)
    •Latest dies manufacturing facilities
    •Latest manufacturing techniques
    Present Status                    99.4 % Complete

     

Wooden Furniture CFC Center & Showroom Chiniot
A state of the art, purpose fully built, common facility center has been established in the hub of furniture making area of Chiniot at a cost of Rs: 12.144 M

Objectives

To provide common facility services to the crafts men to save their time, enhance productivity & to improve their crafts skills to meet the challenges of global furniture market.
Facilities Available
•Wood seasoning plant, (consisting of two kilns) having a capacity of 1200 CFT of wood per month.
•Wood Carving Machine (CNC).
•Air Less Spray Unit.
•Chain Motorizer Machine.
•Spindle Molding Machines.
Present Status               99.7 % Complete

 

Business Support Center for Electrical  Fittings, Sargodha

•State of the art service center built on the cross road of SIE Sargodha & Mianwali road at an estimated cost Rs: 23.809 M, funded by Govt. of Punjab through ADP.

Objectives

•Electrical fittings, accessories are Bakelite & Plastic products are necessary components of home, office, commercial & Industrial enterprise. Sargodha, Karachi & Lahore are the main clusters. 70 % of these fittings are produced in Sargodha. There are 15 large units, 200 SME’s & over 1000 cottage units of electrical fittings. This center will disseminate latest processing techniques to private sector in product designing & die making.

Facilities Available

•Die making facilities .
•Heat treatment facilities.
•Design development facilities.
•Testing facilities of raw materials and finished goods.
Present Status       97 % Complete

 

Industrial development Center for sports goods industry based on composite materials Sialkot

•A modestly designed center on composite based materials for sports goods is being established to support the private sector sports goods manufacturers especially hockey sticks, badminton & tennis rackets with estimated cost of Rs: 19.074 M. The project is funded by Govt. of Punjab.

Objectives

•To provide help in dissemination of information about raw material, specification and quality fabrication to produce products of International standard
•To provide on job training to the skilled, semi skilled workers on composite material technology.
CLUSTER DEVELOPMENT CENTRE FOR METALLURGY CASTING DIES AND AGRICULTURE IMPLEMENTS DASKA

The cost of the project is 58.402 Million. The PC-1 is under revision then after revision its cost will be 67.641 Million. The project is funded by Govt. of Punjab.

Objectives

The main objectives of the proposed Industrial Support Center for Metal industries are as under.


- To provide design development facilities.

- To provide physical testing facilities of raw materials and finished goods in accordance with the laid down specifications.

- Introduction of better production technology to produce goods of desired quality / specifications at higher productivity and at an economical cost.

CLUSTER DEVELOPMENT CENTRE OF LIGHT ENGINEERING INDUSTRIES INCLUDING TEXTILE MACHINERY SPARE PARTS FAISALABAD.

The cost of the project is 95.400 Million. The PC-1 is under revision then after revision its cost will be 111.202 Million. The project is funded by Govt. of Punjab.

Objectives

To Support the Light Engineering Industries including Textile Machinery spare Parts.

CLUSTER DEVELOPMENT CENTRE FOR DEVELOPMENT & PROMOTION OF LIGHT ENGINEERING INDUSTRIES MULTAN

The cost of the project is 95.400 Million. The PC-1 is under revision then after revision its cost will be 111.16 Million. The project is funded by Govt. of Punjab.

Objectives

• Generating growth in the economy to create employment,
• Upgrading technology to enhance profitability,
• Improving the infrastructure necessary for economic uplift,
• Provision of one roof facility to the manufacturers for all issues,
• To introduce state of the art foundry & casting facilities,
• Training and consultancy.
.

CLUSTER DEVELOPMENT CENTRE FOR HAND LOOM INDUSRY MULTAN.

The cost of the project is 41.30 Million. The project is funded by Govt. of Punjab.

Objectives

To Support and advocate the growth of Hand Loom industry.

PURCHASE OF LAND & CONSTRUCTION OF BUILDING FOR THE ESTABLISHMENT OF CDC AGRO FOOD PROCESSING FACILITIES AT MULTAN

The cost of the project is 114.159 Million.

Project is being operated by SMEDA, Pakistan.


INDUSTRIAL INCUBATOR CUM SERVICE CENTRE, FAISALABAD & GUJRANWALA.


The cost of the project is 18.768 Million. The project is funded by MOST, Governement of Pakistan.

Objectives

Shared office space and services, Technical assistance through
Office equipments, Consultancy for development of management system, Project planning & building, Access to knowledge sharing, Training and capacity building, etc.